1. Mar 25, 2017
  2. Mar 24, 2017
    • Wesley W. Terpstra's avatar
      l1tol2: put a flow Q on the exits (#606) · 19eb9b69
      Wesley W. Terpstra authored
      This Xbar connects the largest components in the design; the cores
      and the L2 banks. We already have a full buffer on the core side.
      However, the valid path going to the L2 comes back as a ready path.
      Putting a flow Q also on the outputs of the l1tol2 cuts this path
      in half at no cost to IPC.
      19eb9b69
  3. Mar 23, 2017
  4. Mar 22, 2017
  5. Mar 21, 2017
  6. Mar 20, 2017
  7. Mar 19, 2017
  8. Mar 18, 2017
  9. Mar 17, 2017