1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
|
------------------------------------------------------------------------------
-- --
-- GNAT RUN-TIME COMPONENTS --
-- --
-- A D A . C A L E N D A R . A R I T H M E T I C --
-- --
-- B o d y --
-- --
-- Copyright (C) 2006, Free Software Foundation, Inc. --
-- --
-- GNAT is free software; you can redistribute it and/or modify it under --
-- terms of the GNU General Public License as published by the Free Soft- --
-- ware Foundation; either version 2, or (at your option) any later ver- --
-- sion. GNAT is distributed in the hope that it will be useful, but WITH- --
-- OUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY --
-- or FITNESS FOR A PARTICULAR PURPOSE. See the GNU General Public License --
-- for more details. You should have received a copy of the GNU General --
-- Public License distributed with GNAT; see file COPYING. If not, write --
-- to the Free Software Foundation, 59 Temple Place - Suite 330, Boston, --
-- MA 02111-1307, USA. --
-- --
-- As a special exception, if other files instantiate generics from this --
-- unit, or you link this unit with other files to produce an executable, --
-- this unit does not by itself cause the resulting executable to be --
-- covered by the GNU General Public License. This exception does not --
-- however invalidate any other reasons why the executable file might be --
-- covered by the GNU Public License. --
-- --
-- GNAT was originally developed by the GNAT team at New York University. --
-- Extensive contributions were provided by Ada Core Technologies Inc. --
-- --
------------------------------------------------------------------------------
with Unchecked_Conversion;
package body Ada.Calendar.Arithmetic is
use Leap_Sec_Ops;
Day_Duration : constant Duration := 86_400.0;
---------
-- "+" --
---------
function "+" (Left : Time; Right : Day_Count) return Time is
begin
return Left + Integer (Right) * Day_Duration;
end "+";
function "+" (Left : Day_Count; Right : Time) return Time is
begin
return Integer (Left) * Day_Duration + Right;
end "+";
---------
-- "-" --
---------
function "-" (Left : Time; Right : Day_Count) return Time is
begin
return Left - Integer (Right) * Day_Duration;
end "-";
function "-" (Left, Right : Time) return Day_Count is
Days : Day_Count;
Seconds : Duration;
Leap_Seconds : Leap_Seconds_Count;
begin
Difference (Left, Right, Days, Seconds, Leap_Seconds);
return Days;
end "-";
----------------
-- Difference --
----------------
procedure Difference
(Left, Right : Time;
Days : out Day_Count;
Seconds : out Duration;
Leap_Seconds : out Leap_Seconds_Count)
is
Diff : Duration;
Earlier : Time;
Later : Time;
Leaps_Dur : Duration;
Negate : Boolean;
Next_Leap : Time;
Secs_Diff : Long_Integer;
Sub_Seconds : Duration;
begin
if Left >= Right then
Later := Left;
Earlier := Right;
Negate := False;
else
Later := Right;
Earlier := Left;
Negate := True;
end if;
Diff := Later - Earlier;
Cumulative_Leap_Secs (Earlier, Later, Leaps_Dur, Next_Leap);
if Later >= Next_Leap then
Leaps_Dur := Leaps_Dur + 1.0;
end if;
Diff := Diff - Leaps_Dur;
declare
type D_Int is range 0 .. 2 ** (Duration'Size - 1) - 1;
for D_Int'Size use Duration'Size;
Small_Div : constant D_Int := D_Int (1.0 / Duration'Small);
D_As_Int : D_Int;
function To_D_As_Int is new Unchecked_Conversion (Duration, D_Int);
function To_Duration is new Unchecked_Conversion (D_Int, Duration);
begin
D_As_Int := To_D_As_Int (Diff);
Secs_Diff := Long_Integer (D_As_Int / Small_Div);
Sub_Seconds := To_Duration (D_As_Int rem Small_Div);
end;
Days := Day_Count (Secs_Diff / 86_400);
Seconds := Duration (Secs_Diff mod 86_400) + Sub_Seconds;
Leap_Seconds := Leap_Seconds_Count (Leaps_Dur);
if Negate then
Days := -Days;
Seconds := -Seconds;
Leap_Seconds := -Leap_Seconds;
end if;
end Difference;
end Ada.Calendar.Arithmetic;
|