aboutsummaryrefslogtreecommitdiff
path: root/asm
diff options
context:
space:
mode:
authorAnanth N Mavinakayanahalli <ananth@in.ibm.com>2014-10-16 14:16:40 +0530
committerStewart Smith <stewart@linux.vnet.ibm.com>2014-10-22 18:19:37 +1100
commitbed82938878cff16c539c1c6b3887b2cf65b4f57 (patch)
tree5dd0647e2da6b854c188be93180db5bed542c9da /asm
parent465b156e61f027a10ca3a7de97b857de4bd48bb6 (diff)
downloadskiboot-bed82938878cff16c539c1c6b3887b2cf65b4f57.zip
skiboot-bed82938878cff16c539c1c6b3887b2cf65b4f57.tar.gz
skiboot-bed82938878cff16c539c1c6b3887b2cf65b4f57.tar.bz2
PSI: Drive link down on HIR
After sending the FSP reset sequence via PSIHBCR, drive the PSI link down without actually waiting for the PSI interrupt indicating the 'Link Inactive Transition'. There have been cases where this interrupt doesn't arrive and we are left high and dry waiting for it, while the FSP comes back up and thinks Sapphire is not initializing the new link (bz 117526 for instance). Signed-off-by: Ananth N Mavinakayanahalli <ananth@in.ibm.com> Signed-off-by: Stewart Smith <stewart@linux.vnet.ibm.com>
Diffstat (limited to 'asm')
0 files changed, 0 insertions, 0 deletions